Sambalpur.  P. K. Sinha, Chairman-cum-Managing Director, Mahanadi Coalfields Limited (MCL) laid the foundation stone for a Rs. 268.05 Cr First Mile Connectivity (FMC) Project at Kaniha Area in Talcher Coalfields, Odisha.
The FMC project for Rapid Loading System of coal with a capacity of 10 MTPY is expected to be completed by May, 2023.
MCL is implementing nine FMC projects to provide a pollution-free state-of-the-art rake loading system at a total expenditure of Rs. 3,600 Crores.
सोशल मीडिया पर अपडेट्स के लिए Facebook (https://www.facebook.com/industrialpunch) एवं Twitter (https://twitter.com/IndustrialPunchपर Follow करें …
  • Website Designing